Home  /  Ground, climate and subfloor moisture

Gippsland ground, climate and subfloor moisture

What the Gippsland soil surveys, Bureau of Meteorology stations and building standards say about the ground, the rain and the air under a house, and where each of them stops short of your house.

Gippsland soil and house movement: what the soil surveys say

The soil surveys we read describe Gippsland soils, not building sites, and none of them says whether the ground under a house moves. A soil test classifies the site, and that is the only source for a house. Below is what each survey describes, so you can see what is on the record and what is not.

AreaWhat the survey describesWhat it leaves out
Maffra and Sale river plainsSurface materials "mostly clayey and pervious but may be silty or sandy, particularly in the east"; waterlogging in lower-lying soils; topsoils "typically clay loams over clay subsoils"; "susceptible to compaction, particularly when wet" (land system description). Irrigation soils: depth, permeability and sodicity matter most (Macalister soil survey).Anything about building or movement.
Lindenow, on the Mitchell and Tambo riversAlluvium on level plains under 1 per cent slope, clay about 14 to 26 per cent, "Bed and bank erosion is common along the stream channels" (Lindenow description).Anything about houses.
South Gippsland hillsThe Strzelecki unit "occurs extensively throughout South Gippsland", slopes mostly 10 to 32 per cent, clay loams grading to light and medium clays, shallow soils on steep northern slopes (Strzelecki description).The page names no town and does not mention landslip.
InverlochTertiary sediments, clays below a bleached zone "from sandy clay to heavy clays", with variably cemented "coffee rock" at about 40 to 50 cm (Inverloch description).Anything about moisture change or waterlogging.
Phillip IslandOne mapped unit, red clay on early Tertiary basalt, decomposing basalt generally within 1.5 m (Phillip Island description).Sand and drainage. The coastal sands are not covered.

We found no soil description for Wonthaggi, and the Gippsland Lakes margins are not covered by anything we could use. Where a survey is silent, so are we.

Rainfall by station

Rainfall differs a good deal between Gippsland stations, and the Bureau of Meteorology tables show how much. These are station means. No source we read links them to subfloor moisture, so the table describes the district and not your house.

StationRainfall recordsAnnual mean (mm)Wettest monthDriest month
Bairnsdale Airport (Bureau of Meteorology)1942 to 2026645.1November, 80.6 mmAugust, 36.9 mm
Lakes Entrance, Eastern Beach Road (Bureau of Meteorology)2006 to 2026736.7June, 84.3 mmMay, 41.1 mm
Sale, closed station (Bureau of Meteorology)1870 to 1945606.1October, 63.0 mmJuly, 41.5 mm
Wonthaggi (Bureau of Meteorology)1911 to 2026939.3August, 102.4 mmFebruary, 45.3 mm
Phillip Island Penguin Reserve, closed 2018 (Bureau of Meteorology)1981 to 2018713.6August, 79.7 mmJanuary, 33.4 mm
A dry, tidy crawl space beneath a timber house seen end on, with concrete stumps in a row under the bearers and joists, a bright subfloor vent at the far end and a torch beam on the dirt.
Illustration: a subfloor with a vent opening at the far end, the clearance and ventilation a surveyor may ask about

The closed Sale station is history, not today's weather, so do not read its 606.1 mm as Sale's current rainfall. We fetched no station for Leongatha, Mirboo North, Korumburra, Yarram or Orbost, so we say nothing about their rainfall.

Subfloor ventilation and clearance: the figures for new subfloors

The National Construction Code sets ventilation and clearance figures for new subfloors, and the figures differ by climate zone. In the 2022 Housing Provisions, Part 6.2 sets cross-ventilation openings per metre of external wall, as the table shows (NCC 2022 Housing Provisions Part 6.2).

Climate zoneOpenings per metre of external wallWith an impervious ground membrane
Zone A2,000 mm21,000 mm2
Zone B4,000 mm22,000 mm2
Zone C6,000 mm23,000 mm2

The same part sets a minimum ground clearance for subfloor framing of 150 mm where no termite inspection or management system is required, and 400 mm where termite inspection is required. It allows alternative measures, and clause 6.2.1(5) covers extra protection for high water tables, poor drainage or frequent flooding. CSIRO says crawl spaces need at least 400 mm under bearers, except the final 2 m of a slope, plus ventilation.

Two gaps matter for a house. We did not find which climate zone covers Gippsland, and we did not find whether an existing house must meet these figures when it is restumped. Ask the surveyor what applies to your job, and whether extra protection applies on wet ground.

A soil test classifies the site. The surveys only describe the soil.

Termites and drainage around the house

CSIRO says subterranean termites need soil contact for moisture and build shelter tubes over stumps and ant caps, and that regular inspections, at least annually, are required (CSIRO termite guide). We could not find whether any of the four Gippsland shires has designated termite areas, and we do not copy designation wording from another shire. Ask the surveyor or your council.

The same guide gives drainage points a house owner can act on: grade the ground so rainwater drains away, keep garden sprinklers off walls and stumps, and direct air conditioner drainage away from the house. The industry body's page adds that a termite management system needs clearance for inspection (industry body's subfloor page). The stumps guide covers the materials, and the signs guide covers what to notice inside.

Where to read more by town

Floodplain towns, hill country and the coast each have their own mix of ground, rain and rules. The Sale and Maffra page covers the river plains, the Leongatha, Korumburra and Mirboo North page the hill country, and the Wonthaggi and Inverloch page the Bass Coast clays. The flood and overlay page covers the planning side, and the underpinning page covers footing problems. To ask about your own house, send the town and what you have noticed.

What this guide cannot do

This guide cannot tell you what the ground under your house is like. The soil surveys describe soils across districts, the weather stations describe their own sites, and the National Construction Code figures are for new subfloors. We cannot say whether your ground moves, which climate zone applies or whether your house must meet the figures. We are a referral service: we pass your enquiry to a local builder, who inspects the subfloor and advises, and a registered building surveyor decides what the job needs. A soil test classifies the site.

Written November 2026, checked 6 November 2026

Check the current rules before you rely on this

This page describes what the Gippsland soil surveys, weather stations and the National Construction Code say about the ground, the rain and the air under a house. It describes the rules in general terms as they stood in November 2026, checked 6 November 2026. Standards, forms, thresholds and fees change.

The authoritative sources are National Construction Code 2022, Housing Provisions Part 6.2, subfloor ventilation (new subfloors), CSIRO, managing termites in buildings (guide), Bureau of Meteorology, Bairnsdale Airport climate statistics (station 085279) and Department of Environment, Land, Water and Planning, Gippsland Lakes and 90 Mile Beach coastal hazard assessment summary (April 2014; not a full flood study). Where anything here differs from those sources, they are right and we are not.

We are not builders, building surveyors, regulators or lawyers. For what applies to your job, ask the builder which registration they hold and check it on the Building and Plumbing Commission register, then ask a registered building surveyor and your council what is needed. Contract, deposit and payment rules change by 1 December 2026.

Accurate at the time of writing, November 2026. Always check the source before relying on it.

Questions

Common questions

Does Gippsland rainfall differ much between towns?

The Bureau of Meteorology station tables we read do. The annual means run from 606.1 mm at the closed Sale station to 939.3 mm at Wonthaggi. They are station means over different record periods, so compare them with care. No source we read links rainfall to subfloor moisture or to house restumping.

What is a subfloor vent for?

The National Construction Code sets cross-ventilation openings for new subfloors by climate zone, and CSIRO pairs clearance under bearers with ventilation. The pages we read do not explain the purpose in detail. Ask your surveyor what ventilation applies to your house and whether extra protection is needed on wet ground.

How much clearance should there be under the bearers?

CSIRO says crawl spaces need at least 400 mm under bearers, except the final 2 m of a slope, plus ventilation. The code sets 150 mm or 400 mm for new subfloor framing depending on termite inspection. We did not find whether an existing house must meet these when restumped, so ask the surveyor.

How often should termites be checked?

CSIRO says regular inspections, at least annually, are required. It says termites need soil contact for moisture and build shelter tubes over stumps and ant caps. We could not find whether any of the four Gippsland shires has designated termite areas, so ask the surveyor or the council.

Who classifies the ground under a house?

A soil test classifies the site. The soil surveys we read describe soils across districts, not individual blocks, and none says whether the ground moves. A surveyor or engineer decides whether a soil test is needed for your house and what it should cover.

Do the soil surveys say whether Gippsland clay moves?

No. None of the surveys we read says whether the soils move with moisture, and none addresses building. They describe clays, loams and alluvium, and some mention waterlogging or compaction. Where a survey is silent, this site is silent too.

Is Phillip Island ground the same as the mainland?

The survey we read maps one unit on Phillip Island, red clay on early Tertiary basalt, with decomposing basalt generally within 1.5 m. It does not cover sand or drainage, and the coastal sands are not described. The mainland surveys describe different soils, so the two are not comparable.

Does wet ground mean extra protection for the subfloor?

Clause 6.2.1(5) of the National Construction Code covers extra protection for high water tables, poor drainage or frequent flooding in new subfloors. We cannot say whether your house is affected. Ask the surveyor whether extra protection applies, and ask the builder how drainage is handled.

Next step

Send the town and what the house is doing

The town, the type of house, whether anyone lives in it and what you have noticed under or inside it. That is usually enough for a builder to ask the right questions before an inspection.